Skip to content Skip to footer

Construction completion of Kalloni – Sigri road axis in Lesvos

We feel happy that the handover ceremony of the road axis Kalloni – Sigri in Lesvos filally took place on  the 19th of April 2024.

The design of the Kalloni – Sigri road axis asigned to Doxiadis Associates back on September 2003 and included Highway engineering, traffic studies, survey and cadastre, structural studies, hydraulic studies, environment studies, geological and geotechnical studies and research, sign and safety studies, H/M studies, plantation studies, tender documents.

default