Skip to content Skip to footer

Design and Supervision of Construction of Yaounde – Ayos Highway CAMEROON

Start Date.1986 End Date.1993

Aerial photography and preparation of topographic maps using photogrammetric techniques; preliminary design and setting out of the road alignment; geotechnical and hydrological investigations; environmental study; topographic survey; final design of a 166 km long two lane highway including pavement design; design of five bridges of 100 meters length; hydrological structures design, construction supervision.