Skip to content Skip to footer

Design of the National Highway Ebolowa Kribi Section- CAMEROON

Start Date.01/01/1989End Date01/01/1993Share

Feasibility study, aerial photography and preparation of topographic maps by means of photogrammetric techniques; preliminary design and setting out the road alignment; geotechnical and hydrological investigations; environmental study; topographic survey; final design of a 170 km long, two-lane highway including pavement design; hydrological structures design; preparation of reports and tender documents.