Skip to content Skip to footer

Feasibility Studies for Two Dams in M’roualé – MAYOTTE

Start Date.1996 End Date.1996

Feasibility study for the construction of two dams for water supply and connection to the existing networks. Capacity of each dam 500.000 m3 and height from ground level 13m. The services provided were: hydrological and hydraulic study, topography, detailed geological investigation and cost estimation