Skip to content Skip to footer

Final Engineering Design of Route CC/FF and Jatinegara-Route CC Connection – INDONESIA

Start Date.1990 End Date.1991

Preparation of conceptual, preliminary and final engineering design as well as contract documents for a multi lane urban highway of 11.0 km long, including final design of a 670 m long flyover and six river bridges.