Skip to content Skip to footer

New Athens International Airport Main Terminal Building East, Control Tower, and ATC Building – GREECE

Start Date.1995 End Date.1999

Architectural design and engineering construction drawings for the New Terminal Building, the Control Tower and the ATC building. Assignment of a 25-member design team of experts both in Germany and in Greece.