Rehabilitation of the Beira Fishing Harbour – MOZAMBIQUE

Start Date.01/01/1991End Date01/01/1993Share

A study project of water and power supply networks and area lighting for the fishing harbor of Beira, including: field survey of existing conditions and preparation of relevant reports on the siltation problem of the harbor; master plan; proposals for the rehabilitation of the harbor; economic appraisal with particular reference to the added value of the proposals; environmental impact assessment related to the existing infrastructure and the optimum orientation of the harbor