Skip to content Skip to footer

Studies for the Aktion Preveza Underwater Road Tunnel – GREECE

Start Date.01/01/1995End Date01/01/1997Share

Environmental impact assessment and civil works for the Aktio-Preveza tube tunnel (underwater tunnel length is 1.3 kilometre). The project in addition to the tunnel, which has a two lane right-of-way, included auxiliary buildings, toll stations, and roads and infrastructure networks for the wider area.