Topographic and geotechnical field surveys; preliminary and final design of 23 km of divided highway; design of the associated utility systems; preliminary and final design of over 21 bridges (300 m each), toll plaza, rest areas, parking facilities etc.; preliminary and final design of 4 grade-separated intersections; preparation of expropriation report and tender documents.