Project undertaken for the newly established Organisation "Egnatia Odos A.E." for the preparation of the preliminary and final design of a 25-kilometre, 4-traffic lane section of the Egnatia Motorway, including 13 bridges (2.5 km total length) and 9 km of tunnels. Services offered include: topographic survey and preparation of topographic maps; final design of 25 km 4-lane motorway including pavement design; preliminary, structural and electromechanical design of 13 bridges (total length 2.5 km) and 14 tunnels (total length 9 km); environmental impact assessment studies; hydrolic design; and preparation of tender documents.