Participation under Pacific Consultant International (PCI), in the final engineering design of a 42.0 kms long toll highway (regional freeway) connecting Cikampek with the city of Palimanan. The main involvement of DA concerned the preparation of highway drainage design, drawings and reports as well as tender documents.