Within the framework of comprehensive consultancy services provided by Doxiadis Associates, the company has carried out studies for major hydraulic works which involved all phases of design work, preparation of tender documents, contract management and supervision of construction.
Our company has been providing consultancy services and hydraulic design for contracts that include:
2012/2-ongoing
Design of the new athletic installations for the transfer of activities from the venue of “Apostolos Nicolaidis” at Alexandras Avenue (Redevelopment Area B) at the designated site of the Redevelopment Area A as foreseen from the Urban Cadastral Plan, with the following building terms: - ...
read more2007/11-ongoing
The contract concerns the finalization of road studies needed to connect the city of Lefkas (capital city of the Lefkas Island) with the ‘Ionia Odos’, a major highway and development axis running along the western coast of Greece. The project comprises two segments, namely: ...
read more2009/11-ongoing
Road studies concern the initial part of county road no 27, commencing from the city of Heraklion. This part of the road passes through a considerable number of small and large scale industrial enterprises and workshops, amusement and recreational activity areas, and agricultural lands. ...
read more1999/12-2013/6
The Democrition University of Thrace assigned Doxiadis Associates with the "Infrastructure Works of Xanthi Campus" project. a) Hydraulic study including the planning and design of the water supply, sewage and drainage networks for the campus of Xanthi. The study includes the preliminary and final ...
read more2010/8-2011/9
In September 2011, one year after its commencement, the master planning project for the creation of a new city situated 35 km from Karachi was successfully completed. It is one of the largest and most ambitious projects in Pakistan, which Doxiadis Associates with his ...
read more2009/2-2010/2
The objective of the project was the design of the Amman Eastern Corridor Area (307,51 ha), the entrance gate of the Metropolitan city of Amman from the East. It was developed over 5 phases and 14 individual reports. These 5 phases included the analysis ...
read more2003/8-2010/10
The Kalloni - Eressos - Sigri road is located at the island of Lesbos, in the northeastern Aegean Sea. It has a total length of 50 km. Some road sections required safety improvements, while other sections had to be realigned in order bypass ...
read more2008/2-2009/4
Doxiadis Associates was assigned, as Consultant for Specialized Services of Land Reclamations Works of the Ministry of Agricultural Development and Food, the preparation of the support studies for the preliminary design of the Almopaios Dam in Northern Greece. Almopaios Dam is situated on the Almopaios ...
read more2006/5-2008/1
The objective of the project was the completion of the study phase so that the tendering and construction phases of the segment of Paraionia Highway from the existing Gournia bridge, over the Acheloos River, to the Aetolikon - Aggelokastro - Agrinio road (6.1 ...
read more2000/12-2006/12
The Xanthi - Echinos road is located in northern Greece, near the Bulgarian border. The project concerned the transportation / road-engineering study of a total road length of 9 km, having one 3.75 m wide lane per direction and a hard shoulder of 1.25 ...
read more2003/3-2006/12
Doxiadis Associates were assigned as Consultant for Specialized Services of Land Reclamation Works of the Ministry of Agricultural Development and Food, and were involved in the evaluation of adequacy, the updating and finalization of the project "Construction of Kastania Pond, Alonnisos Island". The pond ...
read more2003/3-2006/12
Doxiadis Associates were assigned as Consultant for Specialized Services of Land Reclamation Works of the Ministry of Agricultural Development and Food, charged with the evaluation of adequacy, updating and maturing of the project "Construction of Panormos Pond on Skopelos Island". The overall storage volume ...
read more2003/3-2006/12
Doxiadis Associates were assigned as Consultant for Specialized Services of Land Reclamation Works of the Ministry of Agricultural Development and Food, tasked with performing the evaluation of adequacy, updating and finalization of the project "Miscellaneous Construction Works for the Kritinia Dam on Rhodes Island". ...
read more2003/2-2005/6
The Heraklion - Viannos is an vital road axis because it provides one of the few connections beween the northern and southern main regional roads of the island of Crete. The project comprised the alignment of the Heraklion - Viannos road, and arrangements on ...
read more2001/5-2005/5
The Motorway Concession Project comprised 4 Concession Schemes. The New Construction part concerned 538 km of Motorway, 71 new Interchanges, and the construction of 28 Km of twin tunnels. The Operation and Maintenance part concerned 838 km of Motorway and 102 Interchanges. Total Construction ...
read more2000/1-2003/5
Final design of the main highway from Derveni to Dorkada (15.8 kms) and the regional road from Kilkis to Langada (11.0 kms), including toposurvey works, highway design, drainage, structural design, geotechnical investigation, traffic management and preparation of tender documents. The main highway is the southern ...
read more1999/4-2003/3
The project concerned the upgrading of the infrastructure of an existing old Quarter of the City of Djibouti, approximately 23 hectares, which is densely populated. The upgrading comprised improvements of the road network, upgrading or reconstruction of the stormwater drainage and sewage systems, and ...
read more2003/05-2003/12
Final architectural, structural, electromechanical design and preparation of tender documents for a 30,000 sq. m. two story building on a 50,000 sq. m. plot area. Services also included the design of a 1,000-vehicles open air parking area, a basement area for the electromechanical installations, ...
read more2001/5-2002/6
read more2002/1-2002/6
read more2002/06-2002/11
Doxiadis Associates undertook the planning and design of the water supply and sewerage networks at Magoula Municipality for all areas already included or to be included in the plan. The study area measures 127 hectares including all expansions of the town-planning layout. Based on ...
read more2000/9-2002/11
Final engineer design for the main highway, that connects the Argos Orestiko interchange (of the vertical axe to Egnatia motorway, beetwen Siatista and Kristallopigi) with the Kastoria – Neapoli road. The study concerns the main road axis, two at grade interchanges, and all necessary complementary ...
read more2001/6-2002/11
read more2001/01-2001/12
The project involved the preliminary design and cost estimate for the upgrading of facility networks at the N. Anchialos, Larisa and Elefsina air force bases in Greece. The cost estimates were to be used for the application of funds from NATO, to conduct the ...
read more1997/5-2001/12
This project was undertaken for the Greek Ministry of Environment, Planning and Public Works. The project concerns the preparation of a reconnaissance, preliminary and final design of a 50 km highway between Xanthi and the Greek Border. The road consists of a two lane ...
read more1998/12-2000/06
"The essence of some visionary intuitions generated one of the main characteristics of the modern consciousness, namely the anthropocentric relationship between man and the natural element embodied in the famous sentence by Protagoras: ""Man is the measure of all things"". The Greek paradigm only ...
read more1998/9-1999/7
Field survey and creation of contour maps for a 9 km highway project. The project consisted of: a. Final design of Highway plan - profiles, cross sections, typical drawings, BOQ; b. Geotechnical evaluation report on soil investigation data (soil investigation executed by others), foundation design ...
read more1998/1-1999/12
Upgrading and extention of existing infrastructure works of three airports. Scope of services comprised preliminary design and application of financing for water supply network, storm water drainage, sewerage network, sewage treatment plant, and preparation of BOQ, specifications and cost estimate.
read more1989/4-1999/12
Topographic, hydraulic and geotechnical field surveys, preliminary and final engineering design of 90 km of expressway including associated utility systems, preliminary and final design of 10 interchanges and 17 highway bridges. Complete study of expropriations, improvement of urban roads connected to the new network, ...
read more1988/7-1999/12
Preliminary reconnaissance of 1,000 km of existing dirt-roads and their ranking in terms of improvement and construction priorities, which resulted in the earthmarking of agricultural roads for their improvement / construction; preliminary engineering design of agricultural link-roads; geotechnical, hydraulic and topographic field surveys; environmental ...
read more1997/8-1999/11
Project undertaken for the newly established Organisation "Egnatia Odos A.E." for the preparation of the preliminary and final design of a 25-kilometre, 4-traffic lane section of the Egnatia Motorway, including 13 bridges (2.5 km total length) and 9 km of tunnels. Services offered include: ...
read more1997/03-1999/06
The first stage of the contract involved reconnaissance surveys, collection of data, the estimation of traffic volumes to assess required cross-sectional elements and pavement structure and the definition of standards to be used. After a preliminary horizontal and vertical design a detailed topographical survey ...
read more1997/7-1998/6
This was the second time that Doxiadis Associates had been called to prepare the country's housing programme, the first occasion had been in 1958. The assignment consisted of the identification of existing and expected future housing needs based on the results of an ...
read more1998/8-1998/12
The project consisted of: a. Final design of Highway plan - profiles, cross sections, typical drawings, BOQ; b. Geotechnical evaluation report on soil investigation data (soil investigation executed by others), foundation design of bridges; c. Structural design of bridges - drawings, calculations; and d. ...
read more1997/11-1998/1
Participation under Pacific Consultant International (PCI), in the final engineering design of a 42.0 kms long toll highway (regional freeway) connecting Cikampek with the city of Palimanan. The main involvement of DA concerned the preparation of highway drainage design, drawings and reports as well ...
read more1994/12-1997/12
Preparation of a revised Master Plan for the satellite new city of Bumi Serpong Damai with the target population size of 580,000 inh. to be located some 20 km. to the west of Jakarta. The Revised Planning for Bumi Serpong Damai New City comprised ...
read more1995/1-1997/12
Development of a large satellite new city of some 380,000 inh., to be located on a site of 3,600 ha some 36 km. from Jakarta. Delta Mas New City, as part of the fast growing industrial and service corridor to the east of Jakarta, ...
read more1989/11-1996/12
The Client constructs and operates large hardware stores. Since 1989, Doxiadis Associates had been providing the following project management services: a) Evaluation of potential land for the implementation of the PRAKTIKER stores, prior to its acquisition, from the point of view of accessibility (traffic), ...
read more1993/1-1996/12
Master Plan, Subdivision Plans and Infrastructure Designs for an estate of 23 hectares. The design brief was for 103 individual residential plots; these were to be supported by community facilities to create a resort estate with a certain degree of functional autonomy. In order ...
read more1991/6-1995/5
The two sites are located in close proximity to each other and have a total area of 68 hectares. Sites are neighboring the site owned by the Hellenic Refineries Association, the master plan of which has been also prepared by Doxiadis Associates ...
read more1990/4-1995/2
Feasibility study, toposurvey works, soil investigations, hydrological and geotechnical studies, reconnaissance and preliminary design for 180 km of highway and 80 km of linking roads; conceptual design for 12 grade separated interchanges; preparation of specifications, bills of quantities and tender documents.
read more1991/1-1995/12
Supervision of rehabilitation of "Quartier 4" in the city of Djibouti; street network reconstruction.
read more1995/11-1995/12
The project is a turn-key package (design and build of a section of a 10km road secttion) to a J/V consisted of the contracting companies: TEG, THESSALIKI and EGNATIA.
read more1993/10-1995/1
Feasibility study and a detailed parcellation plan for the development of an area of 600 ha which was to become a multi-formed residential community for senior civil servants of the State of Qatar. Services provided included: preparation of preliminary and final subdivision plans; final ...
read more1991/12-1994/12
Complete architectural, structural, installation, and infrastructure studies and construction management services for a one-storey market with large selling areas and external parking accommodation
read more1993/2-1994/12
Complete architectural, structural, installation, and infrastructure studies and construction management services for a two-storey market with large selling areas and external parking accommodation
read more1991/9-1993/7
A study project of water and power supply networks and area lighting for the fishing harbor of Beira, including: field survey of existing conditions and preparation of relevant reports on the siltation problem of the harbor; master plan; proposals for the rehabilitation of the ...
read more1989/10-1993/12
Feasibility study, aerial photography and preparation of topographic maps by means of photogrammetric techniques; preliminary design and setting out the road alignment; geotechnical and hydrological investigations; environmental study; topographic survey; final design of a 170 km long, two-lane highway including pavement design; hydrological structures ...
read more1984/7-1993/12
Preliminary reconnaissance of existing dirt-roads and ranking of improvement and construction priorities, resulting in the earmarking of agricultural roads for their improvement/construction; preliminary engineering design of agricultural link-roads; geotechnical, hydrological and topographic field surveys; final engineering design of wide agricultural road including the design ...
read more1986/10-1993/10
Aerial photography and preparation of topographic maps using photogrammetric techniques; preliminary design and setting out of the road alignment; geotechnical and hydrological investigations; environmental study; topographic survey; final design of a 166 km long two lane highway including pavement design; design of five bridges ...
read more1992/4-1992/9
The project area is located in the Northeastern region of the Kingdom of Saudi Arabia. The work involved the construction of road works, drainage structures, pavement construction, traffic marking and signs for approximately 52 km. The project comprised: toposurvey, hydrology and hydraulics, geotechnical investigation, ...
read more1990/10-1992/2
Master Plan of Aspropyrgos Housing Cooperative near Athens. Architectural, engineering and infrastructure studies
read more1989/1-1992/12
Design and construction supervision of a 4,000 sq.m. Shopping Center in Riyadh.
read more1992/1-1992/11
Master Plan, Subdivision Plans and Infrastructure Designs for a residential development to be realized in a privately owned site of 80 hectares. In all, a total of 823 individual plots, each averaging 550 sq.m., were provided. Due to the self-explanatory requirement to protect the ...
read more1985/3-1992/10
Petromin's headquarters in Riyadh was designed on a site bisected by one of the city's municipal roads. The main bulk of the complex - i.e. a nine store office tower for 1,000 employees with reception hall, lounge, exhibition area, auditorium- lies on the 6,500 ...
read more1989/1-1991/8
Complete architectural, structural, electromechanical and infrastructure studies and supervision of construction for an one-store Hypermarket with large selling areas and external parking accommodation.
read more1990/1-1991/2
Preparation of conceptual, preliminary and final engineering design as well as contract documents for a multi lane urban highway of 11.0 km long, including final design of a 670 m long flyover and six river bridges.
read more1990/7-1991/12
A structured plan covering the development of Khartoum from 1991 to 2000; affordable action programmes, including preliminary engineering design and cost estimates for all service sectors for the period 1991-1996; recommendations for financial and institutional reform including the establishment of planning, programing and budgeting ...
read more1990/9-1991/12
Design of 15 km four lane highway in very unstable ground conditions, a 300m tunnel as well as 10 bridges with spans of 20-200m.
read more1989/11-1991/12
Complete architectural, structural, electromechanical and infrastructure studies and construction management services for a two-store market with large selling areas and external parking accommodation.
read more1988/11-1990/7
Preparation of a Master Plan for the Heraklion Teachers Housing Cooperative. Consulting services included: site planning, plot subdivision, road engineering, infrastructure works, solid and liquid waste management, house designs for an agreed number of house types, and landscaping studies.
read more1987/12-1990/4
Consulting services included: survey of existing conditions; elaboration of collected data; identification of alternatives; proposal of short and long term measures; training of locals both on the job and in the consultant's headquarters; development of transportation systems (road, rail, inland water transport, etc.); design ...
read more1989/1-1990/12
Master Plan, plot subdivision scheme, preliminary infrastructure designs,and cost estimates for a residential development on a seaside site communally owned between members of a lawyers housing cooperative.
read more1988/1-1990/12
Master Plan, plot subdivision scheme, preliminary infrastructure designs, and cost estimates for a residential development on a 650 hectare site communally owned between 3,550 members of a housing cooperative.
read more1980/4-1990/12
This project addressed the creation of a community on a parcel of land of 135 hectares. It included the design of the community layout plan, preliminary and final design of buildings, utilities, solid and liquid waste management, roads, parking and landscaping, specifications, tender documents, ...
read more1988/11-1990/11
Study included the preparation of the Master Plan and detailed layout plans for approximately 3,800 housing units
read more1980/3-1988/3
Preliminary and final study for the construction of two dams in the Messara plain (26000 ha) in Crete; thorough topographical survey and soil investigation on ground and soil conditions, in order to find a solution that would combine maximum safety from earthquakes in an ...
read more1972/3-1988/1
Development of the Master Plan. Design of all buildings and infrastructure networks, furniture design as well as the construction management of the project (total floor area of the university buildings amounts to 150,000 m2), environmental impact assessment, selection of materials and equipment, definition of ...
read more1980/4-1987/6
The project called for the complete design for a 9 story office complex (architectural, structural, electromechanical), specifications, tender documents, evaluation of tenders, material research of the local and foreign market of finished products and equipment of the unit, ordering and quality control, supervision of ...
read more1965/1-1973/10
The project, jointly financed by the IDA, included the master plan, design and supervision of construction. The campus design for a student population of 5000 is organized within a central rectangular area with the new academic and residential buildings (dormitory accommodation for 2000) distributed ...
read more1964/1-1968/1
DA prepared the master plan, designed and supervised the construction of the new campus, consisting of a secondary school for 600 students, including dormitories for 100 and a liberal arts college for 350. The two building complexes share an open-air theater, athletic fields and ...
read more