2007/11-ongoing
The contract concerns the finalization of road studies needed to connect the city of Lefkas (capital city of the Lefkas Island) with the ‘Ionia Odos’, a major highway and development axis running along the western coast of Greece. The project comprises two segments, namely: ...
read more2009/11-ongoing
Road studies concern the initial part of county road no 27, commencing from the city of Heraklion. This part of the road passes through a considerable number of small and large scale industrial enterprises and workshops, amusement and recreational activity areas, and agricultural lands. ...
read more2012/2-ongoing
Doxiadis Associates since February of 2012 provides services to the Greek State for the privatization of 37 regional airports in Greece. The services include the evaluation of the existing facilities, the assessment of the existing capacity, the development of forecasts and master plans, the ...
read more2005/1-2013/4
On June 2004 the Municipality of Serres assigned Doxiadis Associates with the preparation of the Regional Development Plan of the Municipality of Serres (total area 25,000 hectares) and the Master Plans of the City of Serres and nine other settlements of the Municipality. The ...
read more2009/12-2010/11
The study was undertaken in the framework of a bid competition organized and overseen by the local government of the Prefecture of Heraklion. The road starts from the Heraklion - Moires National Road and ends at the border of the Heraklion and Rethymnon prefectures. ...
read more2003/8-2010/10
The Kalloni - Eressos - Sigri road is located at the island of Lesbos, in the northeastern Aegean Sea. It has a total length of 50 km. Some road sections required safety improvements, while other sections had to be realigned in order bypass ...
read more2001/12-2008/5
Doxiadis Associates was the leading firm of a consortium which received the first prize in an international competition tendered by the Hellenic Civil Aviation Authority for the design of the New Terminal Building for the "Macedonia" airport in Thessaloniki. Following the competition stage, the ...
read more2000/12-2006/12
The Xanthi - Echinos road is located in northern Greece, near the Bulgarian border. The project concerned the transportation / road-engineering study of a total road length of 9 km, having one 3.75 m wide lane per direction and a hard shoulder of 1.25 ...
read more2004/12-2005/8
Master Plans and Regional Development Studies for the Municipality of Heraklidon and dependent settlements in the Dodecanese island of Kos, performed in three stages in accordance with relevant EU and Greek legislation, for an area of 16,500 hectares comprising five settlements. The study targeted ...
read more2001/5-2005/5
The Motorway Concession Project comprised 4 Concession Schemes. The New Construction part concerned 538 km of Motorway, 71 new Interchanges, and the construction of 28 Km of twin tunnels. The Operation and Maintenance part concerned 838 km of Motorway and 102 Interchanges. Total Construction ...
read more2000/11-2003/01
The project started with the feasibility study to investigate possibilities of exchanging 14 centrally located military bases in the city of Thessaloniki, Northern Greece, with an equal number of public land parcels in the peri-urban area. This first step was followed by the appraisal ...
read more2002/1-2002/6
read more2000/9-2002/11
Final engineer design for the main highway, that connects the Argos Orestiko interchange (of the vertical axe to Egnatia motorway, beetwen Siatista and Kristallopigi) with the Kastoria – Neapoli road. The study concerns the main road axis, two at grade interchanges, and all necessary complementary ...
read more1996/8-2001/7
Maliakos Gulf Crossing project included an 4 km Immersed tube tunnel, that was to be constructed and operated under a D.B.F.O.T. scheme. Doxiadis Associates through its affiliated company Metrotech S.A. provided Technical Consultancy Services to the Greek State in cooperation with large European Firms. ...
read more1997/5-2001/12
This project was undertaken for the Greek Ministry of Environment, Planning and Public Works. The project concerns the preparation of a reconnaissance, preliminary and final design of a 50 km highway between Xanthi and the Greek Border. The road consists of a two lane ...
read more1996/06-2001/08
The "Siatista - Kristallopigi" corridor connects the Egnatia Road with the Albanian Border in Kristallopigi (approx 64 km.). The design had two phases: The first phase included feasibility study and reconnaissance highway - geological - environmental study. The second phase after the finalisation of ...
read more1999/10-2000/01
"The specific objective of the technical assistance was to develop and document a well-founded Business Plan which provided an Egyptian private construction contracting company with a sound basis for decision making and developing measurable improvements over current levels of performance and sufficient information to ...
read more1988/7-1999/12
Preliminary reconnaissance of 1,000 km of existing dirt-roads and their ranking in terms of improvement and construction priorities, which resulted in the earthmarking of agricultural roads for their improvement / construction; preliminary engineering design of agricultural link-roads; geotechnical, hydraulic and topographic field surveys; environmental ...
read more1997/8-1999/11
Project undertaken for the newly established Organisation "Egnatia Odos A.E." for the preparation of the preliminary and final design of a 25-kilometre, 4-traffic lane section of the Egnatia Motorway, including 13 bridges (2.5 km total length) and 9 km of tunnels. Services offered include: ...
read more1993/1-1998/3
Elaboration of a regional plan for the Dodecanese within the framework of ENVIREG Programme. Evaluation of existing data; preparation of feasibility studies on specific projects covering transportation, tourism, agriculture, aquaculture, education, health, etc. Risk assessment and environmental action plans including solid waste management for ...
read more1996/10-1998/1
The main objective of the project was to identify and evaluate a prioritised programme of road capacity expansion projects for implementation, through the conduct of the necessary project identification, screening, economic and environmental feasibility studies, and final engineering design of acceptable projects.
read more1990/8-1997/8
Upgrading and strengthening of the existing agricultural teacher-training with particular reference to farmer training, and training activities relating to agrarian reform and the preservation of the natural environment.
read more1996/9-1997/3
The main objectives of the assignment were: (a) the feasibility study for the reconstruction and improvement of the coastal North-South road axis Vlore - Saranda - Konispol - Sagiada, and the reclassification of the existing road system situation and proposed upgrading according to European ...
read more1995/6-1997/12
Environmental impact assessment and civil works for the Aktio-Preveza tube tunnel (underwater tunnel length is 1.3 kilometre). The project in addition to the tunnel, which has a two lane right-of-way, included auxiliary buildings, toll stations, and roads and infrastructure networks for the wider area.
read more1995/9-1996/5
Traffic forecasts, future growth predictions, site development alternatives and environmental impact studies for the regional airport of Zakynthos island in Western Greece
read more1993/1-1996/1
Data collection and preparation of a 'long term' traffic and trasportation plan for the main port city of Patras (population 250,000); environmental impact assessment, noise and air pollution control studies.
read more1992/1-1995/6
Data review of all technical, administrative and organisational aspects of fisheries; formulation of medium and long term strategies for the rational development of fishing in Malawi with significant input on nature conservation
read more1994/1-1995/6
Provision of Consultancy Services for the preparation of a comprehensive strategy for developing and managing the tourist zone up to the year 2005; elaboration on the marine conservation, environmental protection and beach development aspects of the strategy into a comprehensive/detailed and integrated management plan ...
read more1991/6-1995/5
The two sites are located in close proximity to each other and have a total area of 68 hectares. Sites are neighboring the site owned by the Hellenic Refineries Association, the master plan of which has been also prepared by Doxiadis Associates ...
read more1991/6-1995/5
In 1991 Doxiadis Associates were assigned with the preparation of a master plan for a residential development on a private land of 75 hectares, collectively owned by 809 members of the Greek Refinary Workers Association. The site is situated in the region of Northern ...
read more1993/10-1994/6
Feasibility study and a subsequent detailed parcellation plan for the development of an area of 600 ha to become a multi-formed residential community for senior civil servants of the State of Qatar. The proposed development was comprised of a variety of residential areas with ...
read more1993/8-1994/2
The scope of work involved: environmental surveying and audits; monitoring and evaluation of existing conditions; forecasting of environmental effects due to operation and expected growth of domestic and international traffic volumes; determination of strategies for the eradication of environmental hazards; air, soil and water ...
read more1991/9-1993/7
A study project of water and power supply networks and area lighting for the fishing harbor of Beira, including: field survey of existing conditions and preparation of relevant reports on the siltation problem of the harbor; master plan; proposals for the rehabilitation of the ...
read more1990/3-1993/3
This multi-faced project addressed the alleviation of degraded living conditions experienced in nine secondary cities of the Sindh Province. Consultancy services included: direct support for development planning; preparation of structure plans for each city; assistance in strengthening the overall municipal administration, resource mobilisation and ...
read more1989/10-1993/12
Feasibility study, aerial photography and preparation of topographic maps by means of photogrammetric techniques; preliminary design and setting out the road alignment; geotechnical and hydrological investigations; environmental study; topographic survey; final design of a 170 km long, two-lane highway including pavement design; hydrological structures ...
read more1991/06-1993/12
Implementation support to the government's efforts to stimulate participation of agencies in rural housing reconstruction; demonstration and establishment of better housing loan programmes; improvement of supply, delivery and durability of building materials; environmental planning and management.
read more1986/10-1993/10
Aerial photography and preparation of topographic maps using photogrammetric techniques; preliminary design and setting out of the road alignment; geotechnical and hydrological investigations; environmental study; topographic survey; final design of a 166 km long two lane highway including pavement design; design of five bridges ...
read more1991/10-1992/6
Services included acoustic measurements in approximately 1500 stations and formulation of a prediction model for five main cities of Greece. Proposals for new strategies for the control of noise pollution with regard to the protection of environment.
read more1989/3-1992/3
Follow-up of about 760 projects and the preparation of quarterly and annual reports of the physical and financial progress, the managerial efficiency of the implementation agencies and the social and economic implications of the programme. Examination of environmental legislation issues and proposals for the ...
read more1992/1-1992/11
Master Plan, Subdivision Plans and Infrastructure Designs for a residential development to be realized in a privately owned site of 80 hectares. In all, a total of 823 individual plots, each averaging 550 sq.m., were provided. Due to the self-explanatory requirement to protect the ...
read more1991/5-1991/8
Assistance to the Capital Development Authority for the revision and updating of the Master Plan of Islamabad (present population 390,000 inh.) originally elaborated by Doxiadis Associates in the 1960s, and recent in-house reviews undertaken by CDA. The assignment also included: definition of policies ...
read more1990/9-1991/4
Facilities include a 4D type runway (non precision instrument approach) and auxiliary installations to accommodate an estimated traffic of 1 million passengers/year (year 2015), principally tourists using chartered flights. Site selection was made among three alternative locations, using technical, financial, environmental impact assessment, and ...
read more1987/1-1991/3
DA in association with Landell Mills, U.K., were assigned by the EEC with the provision of technical assistance services for management and implementation of the rehabilitation and development of the fisheries in the Inhambane Province, including environmental management and organisational arrangements
read more1990/7-1991/12
The objective of this project was the preparation of a strategic urban development plan and associated action programmes for the National Capital city. Services offered within the transportation dimension of this project included: Data collection phase including automatic vehicle counts, manual turning movement and ...
read more1987/12-1990/4
Consulting services included: survey of existing conditions; elaboration of collected data; identification of alternatives; proposal of short and long term measures; training of locals both on the job and in the consultant's headquarters; development of transportation systems (road, rail, inland water transport, etc.); design ...
read more1989/3-1990/3
Assessment on the environmental characteristics of the coastal zone; research on potential development regarding markets recreation and tourist facilities; studies on the responsibilities and capabilities of agencies involved; feasibility studies and plans for selected potential recreation and tourist developments; and elaboration of a Coastal ...
read more1972/3-1988/1
Development of the Master Plan. Design of all buildings and infrastructure networks, furniture design as well as the construction management of the project (total floor area of the university buildings amounts to 150,000 m2), environmental impact assessment, selection of materials and equipment, definition of ...
read more