2007/11-ongoing
The contract concerns the finalization of road studies needed to connect the city of Lefkas (capital city of the Lefkas Island) with the ‘Ionia Odos’, a major highway and development axis running along the western coast of Greece. The project comprises two segments, namely: ...
read more2009/11-ongoing
Road studies concern the initial part of county road no 27, commencing from the city of Heraklion. This part of the road passes through a considerable number of small and large scale industrial enterprises and workshops, amusement and recreational activity areas, and agricultural lands. ...
read more1999/12-2013/6
The Democrition University of Thrace assigned Doxiadis Associates with the "Infrastructure Works of Xanthi Campus" project. a) Hydraulic study including the planning and design of the water supply, sewage and drainage networks for the campus of Xanthi. The study includes the preliminary and final ...
read more2009/12-2010/11
The study was undertaken in the framework of a bid competition organized and overseen by the local government of the Prefecture of Heraklion. The road starts from the Heraklion - Moires National Road and ends at the border of the Heraklion and Rethymnon prefectures. ...
read more2003/8-2010/10
The Kalloni - Eressos - Sigri road is located at the island of Lesbos, in the northeastern Aegean Sea. It has a total length of 50 km. Some road sections required safety improvements, while other sections had to be realigned in order bypass ...
read more2006/5-2008/1
The objective of the project was the completion of the study phase so that the tendering and construction phases of the segment of Paraionia Highway from the existing Gournia bridge, over the Acheloos River, to the Aetolikon - Aggelokastro - Agrinio road (6.1 ...
read more2000/12-2006/12
The Xanthi - Echinos road is located in northern Greece, near the Bulgarian border. The project concerned the transportation / road-engineering study of a total road length of 9 km, having one 3.75 m wide lane per direction and a hard shoulder of 1.25 ...
read more2003/2-2005/6
The Heraklion - Viannos is an vital road axis because it provides one of the few connections beween the northern and southern main regional roads of the island of Crete. The project comprised the alignment of the Heraklion - Viannos road, and arrangements on ...
read more2001/5-2005/5
The Motorway Concession Project comprised 4 Concession Schemes. The New Construction part concerned 538 km of Motorway, 71 new Interchanges, and the construction of 28 Km of twin tunnels. The Operation and Maintenance part concerned 838 km of Motorway and 102 Interchanges. Total Construction ...
read more1998/9-2004/10
The project of the Elefsina - Stavros - Spata Airport motorway & Western Ymittos Peripheral road (usually referred to as: "Attiki Odos"), is one of the most important and complex infrastructure projects implemented in Greece. The total budget of the Attiki Odos project amounts ...
read more2000/1-2003/5
Final design of the main highway from Derveni to Dorkada (15.8 kms) and the regional road from Kilkis to Langada (11.0 kms), including toposurvey works, highway design, drainage, structural design, geotechnical investigation, traffic management and preparation of tender documents. The main highway is the southern ...
read more1999/4-2003/3
The project concerned the upgrading of the infrastructure of an existing old Quarter of the City of Djibouti, approximately 23 hectares, which is densely populated. The upgrading comprised improvements of the road network, upgrading or reconstruction of the stormwater drainage and sewage systems, and ...
read more2000/9-2002/11
Final engineer design for the main highway, that connects the Argos Orestiko interchange (of the vertical axe to Egnatia motorway, beetwen Siatista and Kristallopigi) with the Kastoria – Neapoli road. The study concerns the main road axis, two at grade interchanges, and all necessary complementary ...
read more1996/8-2001/7
Maliakos Gulf Crossing project included an 4 km Immersed tube tunnel, that was to be constructed and operated under a D.B.F.O.T. scheme. Doxiadis Associates through its affiliated company Metrotech S.A. provided Technical Consultancy Services to the Greek State in cooperation with large European Firms. ...
read more1997/5-2001/12
This project was undertaken for the Greek Ministry of Environment, Planning and Public Works. The project concerns the preparation of a reconnaissance, preliminary and final design of a 50 km highway between Xanthi and the Greek Border. The road consists of a two lane ...
read more1997/1-2001/12
read more1996/06-2001/08
The "Siatista - Kristallopigi" corridor connects the Egnatia Road with the Albanian Border in Kristallopigi (approx 64 km.). The design had two phases: The first phase included feasibility study and reconnaissance highway - geological - environmental study. The second phase after the finalisation of ...
read more1999/1-1999/7
The Kombolcha-Bati-Mille road has a total length of 132 km of which approximately 52 km is asphalt surfaced and 80 km is gravel surfaced. It is one of the major link roads of the northern parts of Ethiopia, connecting the trunk roads ...
read more1998/9-1999/7
Field survey and creation of contour maps for a 9 km highway project. The project consisted of: a. Final design of Highway plan - profiles, cross sections, typical drawings, BOQ; b. Geotechnical evaluation report on soil investigation data (soil investigation executed by others), foundation design ...
read more1989/4-1999/12
Topographic, hydraulic and geotechnical field surveys, preliminary and final engineering design of 90 km of expressway including associated utility systems, preliminary and final design of 10 interchanges and 17 highway bridges. Complete study of expropriations, improvement of urban roads connected to the new network, ...
read more1988/7-1999/12
Preliminary reconnaissance of 1,000 km of existing dirt-roads and their ranking in terms of improvement and construction priorities, which resulted in the earthmarking of agricultural roads for their improvement / construction; preliminary engineering design of agricultural link-roads; geotechnical, hydraulic and topographic field surveys; environmental ...
read more1997/8-1999/11
Project undertaken for the newly established Organisation "Egnatia Odos A.E." for the preparation of the preliminary and final design of a 25-kilometre, 4-traffic lane section of the Egnatia Motorway, including 13 bridges (2.5 km total length) and 9 km of tunnels. Services offered include: ...
read more1997/03-1999/06
The first stage of the contract involved reconnaissance surveys, collection of data, the estimation of traffic volumes to assess required cross-sectional elements and pavement structure and the definition of standards to be used. After a preliminary horizontal and vertical design a detailed topographical survey ...
read more1998/8-1998/12
The project consisted of: a. Final design of Highway plan - profiles, cross sections, typical drawings, BOQ; b. Geotechnical evaluation report on soil investigation data (soil investigation executed by others), foundation design of bridges; c. Structural design of bridges - drawings, calculations; and d. ...
read more1996/10-1998/1
The main objective of the project was to identify and evaluate a prioritised programme of road capacity expansion projects for implementation, through the conduct of the necessary project identification, screening, economic and environmental feasibility studies, and final engineering design of acceptable projects.
read more1997/11-1998/1
Participation under Pacific Consultant International (PCI), in the final engineering design of a 42.0 kms long toll highway (regional freeway) connecting Cikampek with the city of Palimanan. The main involvement of DA concerned the preparation of highway drainage design, drawings and reports as well ...
read more1997/2-1997/8
The purpose of the study was to assess the feasibility of rehabilitating part of the Addis Ababa - Asmara trunk road, namely the first 513.5 kms of the road originally constructed some sixty years ago. Office and field surveys were conducted in order to ...
read more1996/9-1997/3
The main objectives of the assignment were: (a) the feasibility study for the reconstruction and improvement of the coastal North-South road axis Vlore - Saranda - Konispol - Sagiada, and the reclassification of the existing road system situation and proposed upgrading according to European ...
read more1995/6-1997/12
Environmental impact assessment and civil works for the Aktio-Preveza tube tunnel (underwater tunnel length is 1.3 kilometre). The project in addition to the tunnel, which has a two lane right-of-way, included auxiliary buildings, toll stations, and roads and infrastructure networks for the wider area.
read more1993/1-1996/12
Master Plan, Subdivision Plans and Infrastructure Designs for an estate of 23 hectares. The design brief was for 103 individual residential plots; these were to be supported by community facilities to create a resort estate with a certain degree of functional autonomy. In order ...
read more1991/6-1995/5
The two sites are located in close proximity to each other and have a total area of 68 hectares. Sites are neighboring the site owned by the Hellenic Refineries Association, the master plan of which has been also prepared by Doxiadis Associates ...
read more1991/6-1995/5
In 1991 Doxiadis Associates were assigned with the preparation of a master plan for a residential development on a private land of 75 hectares, collectively owned by 809 members of the Greek Refinary Workers Association. The site is situated in the region of Northern ...
read more1992/4-1995/3
Reconnaissance study of an important north-south (900 km) corridor located along the west coast of Saudi Arabia. The road connects Jeddah to the Yemeni border basins via the cities of: Al Laith, Qunjundah and Jizan. The scope of work includes: feasibility and reconnaissance study, ...
read more1988/1-1995/3
Services offered included: redesign of certain segments of the 25 km 4-lane divided highway outside the Royal Commission property; design of 3 grade-separated interchanges on the bypass (2 with directional ramps and 1 full cloverleaf); traffic estimation and pavement design; preparation of tender documents ...
read more1990/4-1995/2
Feasibility study, toposurvey works, soil investigations, hydrological and geotechnical studies, reconnaissance and preliminary design for 180 km of highway and 80 km of linking roads; conceptual design for 12 grade separated interchanges; preparation of specifications, bills of quantities and tender documents.
read more1991/1-1995/12
Supervision of rehabilitation of "Quartier 4" in the city of Djibouti; street network reconstruction.
read more1995/11-1995/12
The project is a turn-key package (design and build of a section of a 10km road secttion) to a J/V consisted of the contracting companies: TEG, THESSALIKI and EGNATIA.
read more1993/10-1995/1
Feasibility study and a detailed parcellation plan for the development of an area of 600 ha which was to become a multi-formed residential community for senior civil servants of the State of Qatar. Services provided included: preparation of preliminary and final subdivision plans; final ...
read more1994/1-1994/5
Preparation of documents describing the physical configuration of the four rapid transit rail extensions for the Athens Metro Expansion Programme. Doxiadis Associates prepared the final horizontal alignment and vertical profile drawings of each of the four extensions, namely: (i) Sepolia to Peristeri, (ii) Keramikos ...
read more1993/11-1994/4
Elaboration of a number of feasibility studies concerning the upgrading of existing rail links between Vilnius and Klaipeda and between Kaunas and the border at Kaliningrad.
read more1989/10-1993/12
Feasibility study, aerial photography and preparation of topographic maps by means of photogrammetric techniques; preliminary design and setting out the road alignment; geotechnical and hydrological investigations; environmental study; topographic survey; final design of a 170 km long, two-lane highway including pavement design; hydrological structures ...
read more1984/7-1993/12
Preliminary reconnaissance of existing dirt-roads and ranking of improvement and construction priorities, resulting in the earmarking of agricultural roads for their improvement/construction; preliminary engineering design of agricultural link-roads; geotechnical, hydrological and topographic field surveys; final engineering design of wide agricultural road including the design ...
read more1986/10-1993/10
Aerial photography and preparation of topographic maps using photogrammetric techniques; preliminary design and setting out of the road alignment; geotechnical and hydrological investigations; environmental study; topographic survey; final design of a 166 km long two lane highway including pavement design; design of five bridges ...
read more1992/4-1992/9
The project area is located in the Northeastern region of the Kingdom of Saudi Arabia. The work involved the construction of road works, drainage structures, pavement construction, traffic marking and signs for approximately 52 km. The project comprised: toposurvey, hydrology and hydraulics, geotechnical investigation, ...
read more1990/10-1992/2
Master Plan of Aspropyrgos Housing Cooperative near Athens. Architectural, engineering and infrastructure studies
read more1992/1-1992/11
Master Plan, Subdivision Plans and Infrastructure Designs for a residential development to be realized in a privately owned site of 80 hectares. In all, a total of 823 individual plots, each averaging 550 sq.m., were provided. Due to the self-explanatory requirement to protect the ...
read more1990/1-1991/9
Elaboration of a master plan and design studies for the Al Buhairah Resort Centre, to be realised on an area of 28 hectares, situated in a prominent location slopping down towards the artificial Abha Lake, 5 km from the town of Abha. The final ...
read more1990/1-1991/2
Preparation of conceptual, preliminary and final engineering design as well as contract documents for a multi lane urban highway of 11.0 km long, including final design of a 670 m long flyover and six river bridges.
read more1990/9-1991/12
Design of 15 km four lane highway in very unstable ground conditions, a 300m tunnel as well as 10 bridges with spans of 20-200m.
read more1984/2-1991/10
The scope of work of this contract included: preliminary and final designs (architectural, structural, electromechanical, utilities, roads), specifications, tender documents, evaluation of contractors’ proposals and supervision of construction services for Phase II of the new campus of the Nepal Administrative Staff College. Total ...
read more1988/11-1990/7
Preparation of a Master Plan for the Heraklion Teachers Housing Cooperative. Consulting services included: site planning, plot subdivision, road engineering, infrastructure works, solid and liquid waste management, house designs for an agreed number of house types, and landscaping studies.
read more1989/1-1990/12
Master Plan, plot subdivision scheme, preliminary infrastructure designs,and cost estimates for a residential development on a seaside site communally owned between members of a lawyers housing cooperative.
read more1988/1-1990/12
Master Plan, plot subdivision scheme, preliminary infrastructure designs, and cost estimates for a residential development on a 650 hectare site communally owned between 3,550 members of a housing cooperative.
read more1988/11-1990/11
Study included the preparation of the Master Plan and detailed layout plans for approximately 3,800 housing units
read more1985/9-1988/4
Topographic, hydrological and geotechnical field surveys, preliminary and final engineering design of 45 km of arterial and local roads including the associated utility systems, preliminary and final design of 4 diamond interchanges and 3 highway bridges, design of a directional sign system around the ...
read more1972/3-1988/1
Development of the Master Plan. Design of all buildings and infrastructure networks, furniture design as well as the construction management of the project (total floor area of the university buildings amounts to 150,000 m2), environmental impact assessment, selection of materials and equipment, definition of ...
read more