2009/11-ongoing
Road studies concern the initial part of county road no 27, commencing from the city of Heraklion. This part of the road passes through a considerable number of small and large scale industrial enterprises and workshops, amusement and recreational activity areas, and agricultural lands. ...
read more2007/6-2009/7
Purpose of the study is to identify road safety shortcomings and to propose short-term interventions to cope with these problems on the following road axes: a) Heraklio-Moires-Tympaki-Agia Galini, Heraklio-Gouves-Hersonisos-Malia, and Chania-Rethymno, and b) Thiva-Livadia-Amfissa-Nafpaktos. The study had to determine the level of road safety and to ...
read more2000/1-2003/5
Final design of the main highway from Derveni to Dorkada (15.8 kms) and the regional road from Kilkis to Langada (11.0 kms), including toposurvey works, highway design, drainage, structural design, geotechnical investigation, traffic management and preparation of tender documents. The main highway is the southern ...
read more2001/2-2001/12
O.A.K.A is one of the major venues, since it concerns the main Olympic arena of the city of Athens, programmed to host major events and ceremonies of the Games. Areas covered by this main stadium comprise a variety of functions other than the Olympic Stadium. ...
read more2000/11-2001/10
Doxiadis Associates S.A. was involved in this programme as the Architectural and Engineering Consultant for House Market S.A., the company that operates the worldwide chain of houseware stores IKEA in Greece. The a/m store in Thessaloniki occupied an existing building having a total area ...
read more1997/9-2000/2
The Second East Java Urban Development Project was designed to support urban infrastructure investment in a number of towns and cities throughout the province. More specifically, the project provided support to the central and local governments of East Java for the preparation of ...
read more1995/08-2000/01
The object of the contract was to perform a detailed census of the existing situation and conditions of the overall road network infrastructure which included the county of Attica and the island of Salamina, followed by the evaluation of bottlenecks, the formulation of proposals ...
read more1997/03-1999/06
The first stage of the contract involved reconnaissance surveys, collection of data, the estimation of traffic volumes to assess required cross-sectional elements and pavement structure and the definition of standards to be used. After a preliminary horizontal and vertical design a detailed topographical survey ...
read more1996/10-1998/1
The main objective of the project was to identify and evaluate a prioritised programme of road capacity expansion projects for implementation, through the conduct of the necessary project identification, screening, economic and environmental feasibility studies, and final engineering design of acceptable projects.
read more1997/2-1997/8
The purpose of the study was to assess the feasibility of rehabilitating part of the Addis Ababa - Asmara trunk road, namely the first 513.5 kms of the road originally constructed some sixty years ago. Office and field surveys were conducted in order to ...
read more1996/11-1997/4
This project was a continuation of the Road Maintennace Management System - Phase I for the Jabotabek Metropolitan Area (which includes the Capital Jakarta) in Indonesia. The study forms part of the First Jabotabek Urban Development Project and was financed by an IBRD ...
read more1996/9-1997/3
The main objectives of the assignment were: (a) the feasibility study for the reconstruction and improvement of the coastal North-South road axis Vlore - Saranda - Konispol - Sagiada, and the reclassification of the existing road system situation and proposed upgrading according to European ...
read more1995/9-1997/10
This project was related to the design and construction of the Underground System (Metro) for the Athens Metropolitan Area. It included collection and evaluation of transport related data that will allow coordination of the planned extension of the Underground System with other surface means of ...
read more1995/9-1996/9
The basic objectives of the project were: (a) analysis of the present state of the Bulgarian transport infrastructure and the existing programme of priority of investment projects, followed by an evaluation of the investment policies presently pursued by the MOT; (b) to examine and ...
read more1995/9-1996/6
The objective of this technical assistance assignment was to undertake a thorough review of the principal issues and problems faced by the road transport sector in Jordan, and, based on this, to develop options, propose actions (policy, institutional and legislative) and assist in implementing ...
read more1995/9-1996/5
Traffic forecasts, future growth predictions, site development alternatives and environmental impact studies for the regional airport of Zakynthos island in Western Greece
read more1989/11-1996/12
The Client constructs and operates large hardware stores. Since 1989, Doxiadis Associates had been providing the following project management services: a) Evaluation of potential land for the implementation of the PRAKTIKER stores, prior to its acquisition, from the point of view of accessibility (traffic), ...
read more1993/1-1996/1
Data collection and preparation of a 'long term' traffic and trasportation plan for the main port city of Patras (population 250,000); environmental impact assessment, noise and air pollution control studies.
read more1995/3-1995/9
read more1989/10-1995/6
National Origin-Destination study. Consulting services consisted of: evaluation of the previous multimodal O-D study that was carried out in 1979; evaluation of the National Traffic Counting Program; development of proposals for improvements and new procedures for the Traffic Counting Program; revision ...
read more1992/4-1995/3
Reconnaissance study of an important north-south (900 km) corridor located along the west coast of Saudi Arabia. The road connects Jeddah to the Yemeni border basins via the cities of: Al Laith, Qunjundah and Jizan. The scope of work includes: feasibility and reconnaissance study, ...
read more1988/1-1995/3
Services offered included: redesign of certain segments of the 25 km 4-lane divided highway outside the Royal Commission property; design of 3 grade-separated interchanges on the bypass (2 with directional ramps and 1 full cloverleaf); traffic estimation and pavement design; preparation of tender documents ...
read more1993/10-1994/6
Feasibility study and a subsequent detailed parcellation plan for the development of an area of 600 ha to become a multi-formed residential community for senior civil servants of the State of Qatar. The proposed development was comprised of a variety of residential areas with ...
read more1991/08-1994/12
Complete architectural, structural, installation, and infrastructure studies and construction management services for a two-storey market with large selling areas and external parking accommodation
read more1993/2-1994/12
Complete architectural, structural, installation, and infrastructure studies and construction management services for a two-storey market with large selling areas and external parking accommodation
read more1990/4-1993/4
A programme for the preparation of development plans for the cities and villages of Butnan Municipality; master plans for the cities of Tobruq and Burdi; layout plans for the settlements of Qardabah, Omar Al Mukhtar, Qarah, Kambut, Qasr Al Jadi, Bir Al Ashhab, Imsaid ...
read more1990/12-1993/3
Full transportation study for the area of Qatif (pop. 300,000). Services included : data collection phase comprising highway and road furniture inventory, roadside interview surveys, speed survey, automatic counts, manual turning movement and classification counts, etc.; formulation of QRS-II strategic model and preparation ...
read more1991/2-1993/12
Complete architectural, structural, installation, and infrastructure studies and construction management services for a two-storey market with large selling areas and external parking accommodation
read more1991/2-1993/12
Complete architectural, structural, installation, and infrastructure studies and construction management services for a two-storey market with large selling areas and external parking accommodation
read more1985/3-1992/10
Petromin's headquarters in Riyadh was designed on a site bisected by one of the city's municipal roads. The main bulk of the complex - i.e. a nine store office tower for 1,000 employees with reception hall, lounge, exhibition area, auditorium- lies on the 6,500 ...
read more1989/1-1991/8
Complete architectural, structural, electromechanical and infrastructure studies and supervision of construction for an one-store Hypermarket with large selling areas and external parking accommodation.
read more1986/8-1991/8
Services undertaken in association with other Greek and U.K. firms. The task of the Consultants was to assist the Ministry in tendering procedures, and revise when necessary the preliminary study of the Athens Metro. Services offered included recommendations with respect to feeder bus-line; ...
read more1990/9-1991/4
Facilities include a 4D type runway (non precision instrument approach) and auxiliary installations to accommodate an estimated traffic of 1 million passengers/year (year 2015), principally tourists using chartered flights. Site selection was made among three alternative locations, using technical, financial, environmental impact assessment, and ...
read more1989/11-1991/12
Complete architectural, structural, electromechanical and infrastructure studies and construction management services for a two-store market with large selling areas and external parking accommodation.
read more1988/11-1991/12
Data collection phase including highway and road furniture inventory, household interview survey, roadside interview surveys, speed survey, automatic counts, manual turning movement and classification counts, bus on-off counts survey, etc., formulation of QRS-II strategic model and SATURN CBD model and preparation of a long ...
read more1990/7-1991/12
The objective of this project was the preparation of a strategic urban development plan and associated action programmes for the National Capital city. Services offered within the transportation dimension of this project included: Data collection phase including automatic vehicle counts, manual turning movement and ...
read more1987/12-1990/4
Consulting services included: survey of existing conditions; elaboration of collected data; identification of alternatives; proposal of short and long term measures; training of locals both on the job and in the consultant's headquarters; development of transportation systems (road, rail, inland water transport, etc.); design ...
read more1964/1-1968/1
DA prepared the master plan, designed and supervised the construction of the new campus, consisting of a secondary school for 600 students, including dormitories for 100 and a liberal arts college for 350. The two building complexes share an open-air theater, athletic fields and ...