2007/11-ongoing
The contract concerns the finalization of road studies needed to connect the city of Lefkas (capital city of the Lefkas Island) with the ‘Ionia Odos’, a major highway and development axis running along the western coast of Greece. The project comprises two segments, namely: ...
read more2009/11-ongoing
Road studies concern the initial part of county road no 27, commencing from the city of Heraklion. This part of the road passes through a considerable number of small and large scale industrial enterprises and workshops, amusement and recreational activity areas, and agricultural lands. ...
read more2009/7-2014/10
Doxiadis Associates and their accociated partners, undertook the preparation of all drawings, reports and documents required for the rehabilitation of the central square of Almyros, a city of over 10,000 p., and the administrative centre of a major Municipality in Central Greece. First, a ...
read more1999/12-2013/6
The Democrition University of Thrace assigned Doxiadis Associates with the "Infrastructure Works of Xanthi Campus" project. a) Hydraulic study including the planning and design of the water supply, sewage and drainage networks for the campus of Xanthi. The study includes the preliminary and final ...
read more2003/8-2010/10
The Kalloni - Eressos - Sigri road is located at the island of Lesbos, in the northeastern Aegean Sea. It has a total length of 50 km. Some road sections required safety improvements, while other sections had to be realigned in order bypass ...
read more2008/2-2009/4
Doxiadis Associates was assigned, as Consultant for Specialized Services of Land Reclamations Works of the Ministry of Agricultural Development and Food, the preparation of the support studies for the preliminary design of the Almopaios Dam in Northern Greece. Almopaios Dam is situated on the Almopaios ...
read more2006/5-2008/1
The objective of the project was the completion of the study phase so that the tendering and construction phases of the segment of Paraionia Highway from the existing Gournia bridge, over the Acheloos River, to the Aetolikon - Aggelokastro - Agrinio road (6.1 ...
read more2000/12-2006/12
The Xanthi - Echinos road is located in northern Greece, near the Bulgarian border. The project concerned the transportation / road-engineering study of a total road length of 9 km, having one 3.75 m wide lane per direction and a hard shoulder of 1.25 ...
read more2003/2-2005/6
The Heraklion - Viannos is an vital road axis because it provides one of the few connections beween the northern and southern main regional roads of the island of Crete. The project comprised the alignment of the Heraklion - Viannos road, and arrangements on ...
read more2000/1-2003/5
Final design of the main highway from Derveni to Dorkada (15.8 kms) and the regional road from Kilkis to Langada (11.0 kms), including toposurvey works, highway design, drainage, structural design, geotechnical investigation, traffic management and preparation of tender documents. The main highway is the southern ...
read more1998/7-2003/12
The project comprised: a. production of orthomaps and topogrammetric diagrams from aerial photos delivered by the Client, b. updating and correction of the above by field survey, c. collection of private property declarations from owners in the project area, d. feeding all private ...
read more1997/10-2003/12
The project comprised: a. production of orthomaps and topogrammetric diagrams from aerial photos delivered by the Client, b. updating and correction of the above by field survey, c. collection of private property declarations from owners in the project area, d. feeding all private property ...
read more1996/11-2003/12
The project comprised: a. production of orthomaps and topogrammetric diagrams from aerial photos delivered by the Client, b. updating and correction of the above by field survey, c. collection of private property declarations from owners in the project area, d. feeding all private property ...
read more2001/6-2002/11
read more1997/5-2001/12
This project was undertaken for the Greek Ministry of Environment, Planning and Public Works. The project concerns the preparation of a reconnaissance, preliminary and final design of a 50 km highway between Xanthi and the Greek Border. The road consists of a two lane ...
read more1998/9-1999/7
Field survey and creation of contour maps for a 9 km highway project. The project consisted of: a. Final design of Highway plan - profiles, cross sections, typical drawings, BOQ; b. Geotechnical evaluation report on soil investigation data (soil investigation executed by others), foundation design ...
read more1999/1-1999/4
Provision of consultancy services to the Athens International Airport Company (AIA) for defining the technical parameters of the sites located within the boundaries of the company property and which are considered/intended for commercial development.
read more1998/1-1999/12
Upgrading and extention of existing infrastructure works of three airports. Scope of services comprised preliminary design and application of financing for water supply network, storm water drainage, sewerage network, sewage treatment plant, and preparation of BOQ, specifications and cost estimate.
read more1989/4-1999/12
Topographic, hydraulic and geotechnical field surveys, preliminary and final engineering design of 90 km of expressway including associated utility systems, preliminary and final design of 10 interchanges and 17 highway bridges. Complete study of expropriations, improvement of urban roads connected to the new network, ...
read more1988/7-1999/12
Preliminary reconnaissance of 1,000 km of existing dirt-roads and their ranking in terms of improvement and construction priorities, which resulted in the earthmarking of agricultural roads for their improvement / construction; preliminary engineering design of agricultural link-roads; geotechnical, hydraulic and topographic field surveys; environmental ...
read more1997/8-1999/11
Project undertaken for the newly established Organisation "Egnatia Odos A.E." for the preparation of the preliminary and final design of a 25-kilometre, 4-traffic lane section of the Egnatia Motorway, including 13 bridges (2.5 km total length) and 9 km of tunnels. Services offered include: ...
read more1997/03-1999/06
The first stage of the contract involved reconnaissance surveys, collection of data, the estimation of traffic volumes to assess required cross-sectional elements and pavement structure and the definition of standards to be used. After a preliminary horizontal and vertical design a detailed topographical survey ...
read more1997/1-1998/12
The objective of the project was the development of an alphanumeric system for identifying rural land units (parcels) through the assignment of a unique number to each rural real estate property. This required the creation of a base map that would allow the locating ...
read more1997/2-1997/8
The purpose of the study was to assess the feasibility of rehabilitating part of the Addis Ababa - Asmara trunk road, namely the first 513.5 kms of the road originally constructed some sixty years ago. Office and field surveys were conducted in order to ...
read more1996/11-1997/4
This project was a continuation of the Road Maintennace Management System - Phase I for the Jabotabek Metropolitan Area (which includes the Capital Jakarta) in Indonesia. The study forms part of the First Jabotabek Urban Development Project and was financed by an IBRD ...
read more1996/1-1996/9
Feasibility study for the construction of two dams for water supply and connection to the existing networks. Capacity of each dam 500.000 m3 and height from ground level 13m. The services provided were: hydrological and hydraulic study, topography, detailed geological investigation and cost estimation
read more1990/4-1995/2
Feasibility study, toposurvey works, soil investigations, hydrological and geotechnical studies, reconnaissance and preliminary design for 180 km of highway and 80 km of linking roads; conceptual design for 12 grade separated interchanges; preparation of specifications, bills of quantities and tender documents.
read more1995/11-1995/12
The project is a turn-key package (design and build of a section of a 10km road secttion) to a J/V consisted of the contracting companies: TEG, THESSALIKI and EGNATIA.
read more1991/12-1994/12
Complete architectural, structural, installation, and infrastructure studies and construction management services for a one-storey market with large selling areas and external parking accommodation
read more1991/08-1994/12
Complete architectural, structural, installation, and infrastructure studies and construction management services for a two-storey market with large selling areas and external parking accommodation
read more1993/2-1994/12
Complete architectural, structural, installation, and infrastructure studies and construction management services for a two-storey market with large selling areas and external parking accommodation
read more1989/10-1993/12
Feasibility study, aerial photography and preparation of topographic maps by means of photogrammetric techniques; preliminary design and setting out the road alignment; geotechnical and hydrological investigations; environmental study; topographic survey; final design of a 170 km long, two-lane highway including pavement design; hydrological structures ...
read more1984/7-1993/12
Preliminary reconnaissance of existing dirt-roads and ranking of improvement and construction priorities, resulting in the earmarking of agricultural roads for their improvement/construction; preliminary engineering design of agricultural link-roads; geotechnical, hydrological and topographic field surveys; final engineering design of wide agricultural road including the design ...
read more1986/10-1993/10
Aerial photography and preparation of topographic maps using photogrammetric techniques; preliminary design and setting out of the road alignment; geotechnical and hydrological investigations; environmental study; topographic survey; final design of a 166 km long two lane highway including pavement design; design of five bridges ...
read more1992/4-1992/9
The project area is located in the Northeastern region of the Kingdom of Saudi Arabia. The work involved the construction of road works, drainage structures, pavement construction, traffic marking and signs for approximately 52 km. The project comprised: toposurvey, hydrology and hydraulics, geotechnical investigation, ...
read more1992/1-1992/11
Master Plan, Subdivision Plans and Infrastructure Designs for a residential development to be realized in a privately owned site of 80 hectares. In all, a total of 823 individual plots, each averaging 550 sq.m., were provided. Due to the self-explanatory requirement to protect the ...
read more1985/3-1992/10
Petromin's headquarters in Riyadh was designed on a site bisected by one of the city's municipal roads. The main bulk of the complex - i.e. a nine store office tower for 1,000 employees with reception hall, lounge, exhibition area, auditorium- lies on the 6,500 ...
read more1990/1-1991/9
Elaboration of a master plan and design studies for the Al Buhairah Resort Centre, to be realised on an area of 28 hectares, situated in a prominent location slopping down towards the artificial Abha Lake, 5 km from the town of Abha. The final ...
read more1989/1-1991/8
Complete architectural, structural, electromechanical and infrastructure studies and supervision of construction for an one-store Hypermarket with large selling areas and external parking accommodation.
read more1990/1-1991/2
Preparation of conceptual, preliminary and final engineering design as well as contract documents for a multi lane urban highway of 11.0 km long, including final design of a 670 m long flyover and six river bridges.
read more1990/9-1991/12
Design of 15 km four lane highway in very unstable ground conditions, a 300m tunnel as well as 10 bridges with spans of 20-200m.
read more1989/11-1991/12
Complete architectural, structural, electromechanical and infrastructure studies and construction management services for a two-store market with large selling areas and external parking accommodation.
read more1987/12-1990/12
Preparation of architectural engineering, utilities and landscaping design including equipment selection for various children ages; specification writing, bills of quantities and tender documents preparation
read more1972/3-1988/1
Development of the Master Plan. Design of all buildings and infrastructure networks, furniture design as well as the construction management of the project (total floor area of the university buildings amounts to 150,000 m2), environmental impact assessment, selection of materials and equipment, definition of ...
read more1964/1-1968/1
DA prepared the master plan, designed and supervised the construction of the new campus, consisting of a secondary school for 600 students, including dormitories for 100 and a liberal arts college for 350. The two building complexes share an open-air theater, athletic fields and ...
read more