2007/11-ongoing
The contract concerns the finalization of road studies needed to connect the city of Lefkas (capital city of the Lefkas Island) with the Ionia Odos, a major highway and development axis running along the western coast of Greece. The project comprises two segments, namely: ...
read more2009/11-ongoing
Road studies concern the initial part of county road no 27, commencing from the city of Heraklion. This part of the road passes through a considerable number of small and large scale industrial enterprises and workshops, amusement and recreational activity areas, and agricultural lands. ...
read more2003/8-2010/10
The Kalloni - Eressos - Sigri road is located at the island of Lesbos, in the northeastern Aegean Sea. It has a total length of 50 km. Some road sections required safety improvements, while other sections had to be realigned in order bypass ...
read more2006/5-2008/1
The objective of the project was the completion of the study phase so that the tendering and construction phases of the segment of Paraionia Highway from the existing Gournia bridge, over the Acheloos River, to the Aetolikon - Aggelokastro - Agrinio road (6.1 ...
read more2000/12-2006/12
The Xanthi - Echinos road is located in northern Greece, near the Bulgarian border. The project concerned the transportation / road-engineering study of a total road length of 9 km, having one 3.75 m wide lane per direction and a hard shoulder of 1.25 ...
read more2003/2-2005/6
The Heraklion - Viannos is an vital road axis because it provides one of the few connections beween the northern and southern main regional roads of the island of Crete. The project comprised the alignment of the Heraklion - Viannos road, and arrangements on ...
read more2001/5-2005/5
The Motorway Concession Project comprised 4 Concession Schemes. The New Construction part concerned 538 km of Motorway, 71 new Interchanges, and the construction of 28 Km of twin tunnels. The Operation and Maintenance part concerned 838 km of Motorway and 102 Interchanges. Total Construction ...
read more2000/1-2003/5
Final design of the main highway from Derveni to Dorkada (15.8 kms) and the regional road from Kilkis to Langada (11.0 kms), including toposurvey works, highway design, drainage, structural design, geotechnical investigation, traffic management and preparation of tender documents. The main highway is the southern ...
read more1999/4-2003/3
The project concerned the upgrading of the infrastructure of an existing old Quarter of the City of Djibouti, approximately 23 hectares, which is densely populated. The upgrading comprised improvements of the road network, upgrading or reconstruction of the stormwater drainage and sewage systems, and ...
read more2000/9-2002/11
Final engineer design for the main highway, that connects the Argos Orestiko interchange (of the vertical axe to Egnatia motorway, beetwen Siatista and Kristallopigi) with the Kastoria Neapoli road. The study concerns the main road axis, two at grade interchanges, and all necessary complementary ...
read more1997/5-2001/12
This project was undertaken for the Greek Ministry of Environment, Planning and Public Works. The project concerns the preparation of a reconnaissance, preliminary and final design of a 50 km highway between Xanthi and the Greek Border. The road consists of a two lane ...
read more1998/9-1999/7
Field survey and creation of contour maps for a 9 km highway project. The project consisted of: a. Final design of Highway plan - profiles, cross sections, typical drawings, BOQ; b. Geotechnical evaluation report on soil investigation data (soil investigation executed by others), foundation design ...
read more1989/4-1999/12
Topographic, hydraulic and geotechnical field surveys, preliminary and final engineering design of 90 km of expressway including associated utility systems, preliminary and final design of 10 interchanges and 17 highway bridges. Complete study of expropriations, improvement of urban roads connected to the new network, ...
read more1988/7-1999/12
Preliminary reconnaissance of 1,000 km of existing dirt-roads and their ranking in terms of improvement and construction priorities, which resulted in the earthmarking of agricultural roads for their improvement / construction; preliminary engineering design of agricultural link-roads; geotechnical, hydraulic and topographic field surveys; environmental ...
read more1997/8-1999/11
Project undertaken for the newly established Organisation "Egnatia Odos A.E." for the preparation of the preliminary and final design of a 25-kilometre, 4-traffic lane section of the Egnatia Motorway, including 13 bridges (2.5 km total length) and 9 km of tunnels. Services offered include: ...
read more1997/03-1999/06
The first stage of the contract involved reconnaissance surveys, collection of data, the estimation of traffic volumes to assess required cross-sectional elements and pavement structure and the definition of standards to be used. After a preliminary horizontal and vertical design a detailed topographical survey ...
read more1998/8-1998/12
The project consisted of: a. Final design of Highway plan - profiles, cross sections, typical drawings, BOQ; b. Geotechnical evaluation report on soil investigation data (soil investigation executed by others), foundation design of bridges; c. Structural design of bridges - drawings, calculations; and d. ...
read more1997/11-1998/1
Participation under Pacific Consultant International (PCI), in the final engineering design of a 42.0 kms long toll highway (regional freeway) connecting Cikampek with the city of Palimanan. The main involvement of DA concerned the preparation of highway drainage design, drawings and reports as well ...
read more1990/4-1995/2
Feasibility study, toposurvey works, soil investigations, hydrological and geotechnical studies, reconnaissance and preliminary design for 180 km of highway and 80 km of linking roads; conceptual design for 12 grade separated interchanges; preparation of specifications, bills of quantities and tender documents.
read more1995/11-1995/12
The project is a turn-key package (design and build of a section of a 10km road secttion) to a J/V consisted of the contracting companies: TEG, THESSALIKI and EGNATIA.
read more1989/10-1993/12
Feasibility study, aerial photography and preparation of topographic maps by means of photogrammetric techniques; preliminary design and setting out the road alignment; geotechnical and hydrological investigations; environmental study; topographic survey; final design of a 170 km long, two-lane highway including pavement design; hydrological structures ...
read more1984/7-1993/12
Preliminary reconnaissance of existing dirt-roads and ranking of improvement and construction priorities, resulting in the earmarking of agricultural roads for their improvement/construction; preliminary engineering design of agricultural link-roads; geotechnical, hydrological and topographic field surveys; final engineering design of wide agricultural road including the design ...
read more1986/10-1993/10
Aerial photography and preparation of topographic maps using photogrammetric techniques; preliminary design and setting out of the road alignment; geotechnical and hydrological investigations; environmental study; topographic survey; final design of a 166 km long two lane highway including pavement design; design of five bridges ...
read more1992/4-1992/9
The project area is located in the Northeastern region of the Kingdom of Saudi Arabia. The work involved the construction of road works, drainage structures, pavement construction, traffic marking and signs for approximately 52 km. The project comprised: toposurvey, hydrology and hydraulics, geotechnical investigation, ...
read more1990/1-1991/2
Preparation of conceptual, preliminary and final engineering design as well as contract documents for a multi lane urban highway of 11.0 km long, including final design of a 670 m long flyover and six river bridges.
read more1990/9-1991/12
Design of 15 km four lane highway in very unstable ground conditions, a 300m tunnel as well as 10 bridges with spans of 20-200m.
read more