1999/12-2013/6
The Democrition University of Thrace assigned Doxiadis Associates with the "Infrastructure Works of Xanthi Campus" project. a) Hydraulic study including the planning and design of the water supply, sewage and drainage networks for the campus of Xanthi. The study includes the preliminary and final ...
read more2010/8-2011/9
In September 2011, one year after its commencement, the master planning project for the creation of a new city situated 35 km from Karachi was successfully completed. It is one of the largest and most ambitious projects in Pakistan, which Doxiadis Associates with his ...
read more2009/2-2010/2
The objective of the project was the design of the Amman Eastern Corridor Area (307,51 ha), the entrance gate of the Metropolitan city of Amman from the East. It was developed over 5 phases and 14 individual reports. These 5 phases included the analysis ...
read more2003/3-2006/12
Doxiadis Associates were assigned as Consultant for Specialized Services of Land Reclamation Works of the Ministry of Agricultural Development and Food, and were involved in the evaluation of adequacy, the updating and finalization of the project "Construction of Kastania Pond, Alonnisos Island". The pond ...
read more2003/3-2006/12
Doxiadis Associates were assigned as Consultant for Specialized Services of Land Reclamation Works of the Ministry of Agricultural Development and Food, charged with the evaluation of adequacy, updating and maturing of the project "Construction of Panormos Pond on Skopelos Island". The overall storage volume ...
read more2003/3-2006/12
Doxiadis Associates were assigned as Consultant for Specialized Services of Land Reclamation Works of the Ministry of Agricultural Development and Food, tasked with performing the evaluation of adequacy, updating and finalization of the project "Miscellaneous Construction Works for the Kritinia Dam on Rhodes Island". ...
read more1999/4-2003/3
The project concerned the upgrading of the infrastructure of an existing old Quarter of the City of Djibouti, approximately 23 hectares, which is densely populated. The upgrading comprised improvements of the road network, upgrading or reconstruction of the stormwater drainage and sewage systems, and ...
read more2001/5-2002/6
read more2002/1-2002/6
read more2002/06-2002/11
Doxiadis Associates undertook the planning and design of the water supply and sewerage networks at Magoula Municipality for all areas already included or to be included in the plan. The study area measures 127 hectares including all expansions of the town-planning layout. Based on ...
read more2001/6-2002/11
read more2001/01-2001/12
The project involved the preliminary design and cost estimate for the upgrading of facility networks at the N. Anchialos, Larisa and Elefsina air force bases in Greece. The cost estimates were to be used for the application of funds from NATO, to conduct the ...
read more1998/1-1999/12
Upgrading and extention of existing infrastructure works of three airports. Scope of services comprised preliminary design and application of financing for water supply network, storm water drainage, sewerage network, sewage treatment plant, and preparation of BOQ, specifications and cost estimate.
read more1997/7-1998/6
This was the second time that Doxiadis Associates had been called to prepare the country's housing programme, the first occasion had been in 1958. The assignment consisted of the identification of existing and expected future housing needs based on the results of an ...
read more1994/12-1997/12
Preparation of a revised Master Plan for the satellite new city of Bumi Serpong Damai with the target population size of 580,000 inh. to be located some 20 km. to the west of Jakarta. The Revised Planning for Bumi Serpong Damai New City comprised ...
read more1995/1-1997/12
Development of a large satellite new city of some 380,000 inh., to be located on a site of 3,600 ha some 36 km. from Jakarta. Delta Mas New City, as part of the fast growing industrial and service corridor to the east of Jakarta, ...
read more1993/1-1996/12
Master Plan, Subdivision Plans and Infrastructure Designs for an estate of 23 hectares. The design brief was for 103 individual residential plots; these were to be supported by community facilities to create a resort estate with a certain degree of functional autonomy. In order ...
read more1991/1-1995/12
Supervision of rehabilitation of "Quartier 4" in the city of Djibouti; street network reconstruction.
read more1993/10-1995/1
Feasibility study and a detailed parcellation plan for the development of an area of 600 ha which was to become a multi-formed residential community for senior civil servants of the State of Qatar. Services provided included: preparation of preliminary and final subdivision plans; final ...
read more1991/9-1993/7
A study project of water and power supply networks and area lighting for the fishing harbor of Beira, including: field survey of existing conditions and preparation of relevant reports on the siltation problem of the harbor; master plan; proposals for the rehabilitation of the ...
read more1990/10-1992/2
Master Plan of Aspropyrgos Housing Cooperative near Athens. Architectural, engineering and infrastructure studies
read more1992/1-1992/11
Master Plan, Subdivision Plans and Infrastructure Designs for a residential development to be realized in a privately owned site of 80 hectares. In all, a total of 823 individual plots, each averaging 550 sq.m., were provided. Due to the self-explanatory requirement to protect the ...
read more1990/7-1991/12
A structured plan covering the development of Khartoum from 1991 to 2000; affordable action programmes, including preliminary engineering design and cost estimates for all service sectors for the period 1991-1996; recommendations for financial and institutional reform including the establishment of planning, programing and budgeting ...
read more1988/11-1990/7
Preparation of a Master Plan for the Heraklion Teachers Housing Cooperative. Consulting services included: site planning, plot subdivision, road engineering, infrastructure works, solid and liquid waste management, house designs for an agreed number of house types, and landscaping studies.
read more1987/12-1990/4
Consulting services included: survey of existing conditions; elaboration of collected data; identification of alternatives; proposal of short and long term measures; training of locals both on the job and in the consultant's headquarters; development of transportation systems (road, rail, inland water transport, etc.); design ...
read more1989/1-1990/12
Master Plan, plot subdivision scheme, preliminary infrastructure designs,and cost estimates for a residential development on a seaside site communally owned between members of a lawyers housing cooperative.
read more1988/1-1990/12
Master Plan, plot subdivision scheme, preliminary infrastructure designs, and cost estimates for a residential development on a 650 hectare site communally owned between 3,550 members of a housing cooperative.
read more1980/4-1990/12
This project addressed the creation of a community on a parcel of land of 135 hectares. It included the design of the community layout plan, preliminary and final design of buildings, utilities, solid and liquid waste management, roads, parking and landscaping, specifications, tender documents, ...
read more1988/11-1990/11
Study included the preparation of the Master Plan and detailed layout plans for approximately 3,800 housing units
read more1972/3-1988/1
Development of the Master Plan. Design of all buildings and infrastructure networks, furniture design as well as the construction management of the project (total floor area of the university buildings amounts to 150,000 m2), environmental impact assessment, selection of materials and equipment, definition of ...
read more