2001/5-2006/5
Doxiadis Associates, acting as a member of the Cohesion Consulting Group (i.e. a consortium of consultants supporting the EC Cohesion Fund) was involved in the monitoring of the project management and quality assurance procedures as well as the utilization of funds on the PATHE ...
read more2001/5-2005/5
The Motorway Concession Project comprised 4 Concession Schemes. The New Construction part concerned 538 km of Motorway, 71 new Interchanges, and the construction of 28 Km of twin tunnels. The Operation and Maintenance part concerned 838 km of Motorway and 102 Interchanges. Total Construction ...
read more1998/9-2004/10
The project of the Elefsina - Stavros - Spata Airport motorway & Western Ymittos Peripheral road (usually referred to as: "Attiki Odos"), is one of the most important and complex infrastructure projects implemented in Greece. The total budget of the Attiki Odos project amounts ...
read more1997/9-2000/2
The Second East Java Urban Development Project was designed to support urban infrastructure investment in a number of towns and cities throughout the province. More specifically, the project provided support to the central and local governments of East Java for the preparation of ...
read more1996/11-2000/05
Technical Support services to the newly established organisation "EYDE/PATHE" for the design and construction management of Patras - Athens - Thessaloniki - Evzoni expressway (600 km). Services provided consisted of 500 m/m of full time and short term experts to provide to the Client ...
read more1987/06-2000/03
The study's aims were to develop a model for main-frame computers, prepare specifications and assist the Ministry in acquiring all equipment required for data collection/processing, validate the above-mentioned model by means of data collection, undertake to run the system over the initial 3 ...
read more1989/4-1999/12
Topographic, hydraulic and geotechnical field surveys, preliminary and final engineering design of 90 km of expressway including associated utility systems, preliminary and final design of 10 interchanges and 17 highway bridges. Complete study of expropriations, improvement of urban roads connected to the new network, ...
read more1988/7-1999/12
Preliminary reconnaissance of 1,000 km of existing dirt-roads and their ranking in terms of improvement and construction priorities, which resulted in the earthmarking of agricultural roads for their improvement / construction; preliminary engineering design of agricultural link-roads; geotechnical, hydraulic and topographic field surveys; environmental ...
read more1997/03-1999/06
The first stage of the contract involved reconnaissance surveys, collection of data, the estimation of traffic volumes to assess required cross-sectional elements and pavement structure and the definition of standards to be used. After a preliminary horizontal and vertical design a detailed topographical survey ...
read more1994/6-1995/8
Within the overall set of objectives of the First Jabotabek Urban Development Project, the specific role of this technical assistance was to: (a) assist and support Dinas PU DKI in the supervision of the construction of Manggarai Connection; (b) ensure that the construction work ...
read more1988/1-1995/3
Services offered included: redesign of certain segments of the 25 km 4-lane divided highway outside the Royal Commission property; design of 3 grade-separated interchanges on the bypass (2 with directional ramps and 1 full cloverleaf); traffic estimation and pavement design; preparation of tender documents ...
read more1991/1-1995/12
Supervision of rehabilitation of "Quartier 4" in the city of Djibouti; street network reconstruction.
read more1992/4-1994/8
Technical assistance/supervision and on site support of construction of two flyovers of a total length of 700 m. Services provided: overall supervision, quality control, quantity control and certification, monitoring construction programmes, reporting, as built drawings, handing over services and final certification.
read more1984/7-1993/12
Preliminary reconnaissance of existing dirt-roads and ranking of improvement and construction priorities, resulting in the earmarking of agricultural roads for their improvement/construction; preliminary engineering design of agricultural link-roads; geotechnical, hydrological and topographic field surveys; final engineering design of wide agricultural road including the design ...
read more1986/10-1993/10
Aerial photography and preparation of topographic maps using photogrammetric techniques; preliminary design and setting out of the road alignment; geotechnical and hydrological investigations; environmental study; topographic survey; final design of a 166 km long two lane highway including pavement design; design of five bridges ...
read more1992/4-1992/9
The project area is located in the Northeastern region of the Kingdom of Saudi Arabia. The work involved the construction of road works, drainage structures, pavement construction, traffic marking and signs for approximately 52 km. The project comprised: toposurvey, hydrology and hydraulics, geotechnical investigation, ...
read more